CUTTING HEAD SYSTEM – 5 SEPARATION LINES + 1 RE-CUTTING HEAD

CUTTING HEAD SYSTEM – 5 SEPARATION LINES + 1 RE-CUTTING HEAD

Description: The Kernel Shelling System is designed to separate the hard shell from the cashew kernel after the steaming process. This is a critical stage that directly affects the whole kernel rate and final product quality.

Working Principle: The system operates using automatic cutting or pressing mechanisms, ensuring precise shell cracking while minimizing kernel breakage.

Purpose:

  • Increase whole kernel recovery rate
  • Reduce breakage and material loss
  • Improve production capacity
  • Ensure stable output quality

Include:

  • 12-Knife Cutting Head – 4 pcs
  • Separation Line 1 (5.5m) – 1 pcs
  • Separation Line 2 (5.5m) – 1 pcs
  • Separation Line 3 – 1 pcs
  • Separation Line 4 (Dust Floor) – 1 pcs
  • Separation Line 5 (Re-cut Line) – 1 pcs
  • Small Floor on Separation – 1 pcs
  • Centrifugal Machine – 3 pcs
  • Air Blower 1.5kW – 4 pcs
  • Shell Storage Bin – 1 pcs
  • Feeding Hopper – 1 pcs
  • Single Grader + Air Blower 1.5kW – 3 sets
  • Double Grader + Air Blower 2.2kW – 2 sets
  • Star Separator + 1.5kW Blower – 1 set
  • Roller Separator – 3 Lines – 1 set
  • Roller Separator – 5 Lines – 1 set
  • Hopper on Cutting Head – 1 pcs
  • Bucket Conveyor – Feeding 4.5m – 1 set
  • Bucket Conveyor – Dust Floor (3m) – 1 set
  • Kernel Collecting Bucket Conveyor – 1 set
  • Double Bucket Conveyor – 1 set
  • 3-Bucket Conveyor to Roller Separator – 1 set
  • Electrical Control Panel – 1 pcs

Technical Specifications:

  • Capacity: 1,100–1,450 kgs/h
  • First cut rate: ≥ 90% (Size AB), ≥ 85% (Size CD)
  • Breakage rate: 2–4% (Size AB), 4–6% (Size CD)
  • Dimension: 15 × 5 × 4 m (L × W × H)

FAQ

How can we get consultation or quotation?2026-04-27T06:38:22+00:00

You can contact us directly for:

  • Free consultation
  • Solution proposal
  • Quotation based on your needs
Can you upgrade existing factories?2026-04-27T06:37:59+00:00

Yes. We offer equipment upgrades and system optimization to improve performance without rebuilding the entire factory.

Why should we choose Gia Loi Long An?2026-04-27T06:37:43+00:00

Because we don’t just supply machines — we provide complete solutions and long-term partnership, helping customers:

  • Improve productivity
  • Reduce costs
  • Achieve sustainable growth

“Not just a service – It’s a companionship.”

How long does it take to complete a project?2026-04-27T06:35:35+00:00

Project timelines depend on:

  • Factory size
  • Equipment complexity
  • Customization level

Typically, projects range from a few weeks to several months from design to full operation.

Do you support international projects?2026-04-27T06:35:17+00:00

Yes. We have implemented 500+ projects across more than 10 countries, including markets in Asia and Africa

What after-sales support do you provide?2026-04-27T06:34:59+00:00

We provide long-term support including:

  • Maintenance & servicing
  • Technical troubleshooting
  • Remote and on-site assistance

We believe support is not just a service, but a long-term commitment to our customers.

Our Trusted Partners

Building long-term partnerships across international markets
Go to Top